Showing posts with label kiln building. Show all posts
Showing posts with label kiln building. Show all posts

Friday, October 7, 2016

Dear Diana Gabaldon


I've been listening to the Outlander book series while driving back and forth between North Carolina and Virginia for work. The content has been a pleasant way to pass the time and the historical inaccuracies or material culture flaws have been able to be brushed off. Until now.

I'm into book six of the series, A Breath of Snow and Ashes, and I started to have suspicions about what could come when Brianna was trying to figure out how to make pipes for a water system. Of course, when I first heard this I thought, "well, the Moravians in Pennsylvania had figured out how to do that in the 1750s" (the book series at this point being in the 1770s). And then, since the characters are living in North Carolina, they mentioned the Moravian potters in Salem, and I thought, "oh, no, I know where this is going."

When Brianna started digging a pit for her "groundhog kiln" I thought I was going to go crazy while driving down the highway! I understand the need to empower Brianna and give her the ability to use her engineering degree and her knowledge of things she knew and learned in the future, but building a kiln (and I assume making pottery) without any background or training is going a bit too far for me. She had a glassblower make the piece for her mother's surgery, why didn't she build a glass furnace and blow the piece herself? I'm not even to the point of whether or how she makes the pipes, but am worried she is just going to hop on a wheel and make them, which just flummoxes me.

Not to mention that she supposedly went to the Moravians and talked to them about their pottery and their "groundhog kiln". I have issue with this on several levels.

Let's start with the kiln. The Moravians didn't use a groundhog kiln as we think about one today. The kiln site excavated both in Bethabara and Salem showed a rectangular base, and was more than likely a tall, rectangular up or downdraft like one of the German kilns, only smaller. I personally think the one currently in use for demonstration at Salem is too short of a stack and should be much taller. They could have also been using what is sometimes called a "beehive" kiln, which a lot of early American earthenware potters employed. I don't have the reports or books on the kiln excavations from Salem and Bethabara at hand to double check the floor, but I am SURE it was NOT a "groundhog". The concept of the groundhog kiln as far as I understand stems mostly from the kilns used at Edgefield in the early 1800s. The term "groundhog kiln" wasn't even in use.The earliest reference I could find on Google books for the term "groundhog kiln" was 1944, and I suspect that it doesn't go much earlier than the late 19th-century.

Now let's go back to Brianna supposedly going to Salem and talking to the potters about their kiln. There isn't a chance one of those potters would have talked to her! The industrial quarters of the Moravian communities were off limits to many visitors, particularly women. Both the Pennsylvania and North Carolina Moravians used a system of having a "Fremden Diener" meet visitors to the town and guide them through the area based on their sex. In Bethlehem, as I understand, women went to see what the women's choirs were doing, and the men went to see the industrial things. I don't imagine this differed much in North Carolina. Much less that the Moravians were a closed community, meaning they did not allow visitors to freely wander through the town- some never made it past the tavern or inn, and may have only had the chance to attend a service at the church or listen to the music. The idea that Brianna went and learned trade secrets, much less enough to BUILD A KILN is flabbergasting. I didn't just go about building a kiln without years of research and the help and assistance of many potters and kiln builders.

We'll see if I make it through book six. I might lose my mind when Brianna magically fires up a successful kiln at first go. Sorry, Diana Gabaldon, you lost my ability to have any focus with these inaccuracies!

Sunday, October 14, 2012

Kiln Baking

 Perhaps it was the anticipation of a tasty snack after the kiln, or perhaps the excitement of trying something different. Either way, following the kiln firing today I took some biscuits I made with sausage patties I cooked last night and slices of cheese, wrapped them in aluminum foil, and baked them in the firing ports of the kiln.
 "How long do you bake a biscuit at 2000 degrees?" you might ask, well, not very long, and you should really flip it not just rotate it because the bottom gets a little too toasty.
I finished loading the kiln on Saturday, and we started it Saturday evening at around 7:00 pm. We wanted to try a different firing schedule. I also modified the exit flue in the back of the chimney by putting a row of bricks down the center to cut down on the airflow. I think this helped in the case of wood consumption and temperature climbing, but may have added to the increased reduction that I saw in comparison to the last firing.
We very professionally kept track of the temperatures by marking up a piece of wood with the temperature climbing. What fascinates me is that I could have had the kiln to temperature and probably salting by 8-9:00 in the morning, but because I was alone at the time and not expecting others to arrive for a while, I had to maintain and stall the climb. So it was nice to know that I can get the kiln rolling and possibly finished in under 15 hours, and that is with single firing. Here are some peeks into the kiln during the crash cool:
Ash covered wine cups

Cobalt blue decoration

Outline of an ornament


Monday, September 17, 2012

Successful Firing!

Brenda salting the kiln
 Yesterday was a success in firing my kiln for the second go-around. I installed three passive dampers in the rear and sides of the chimney prior to the firing. That basically means I knocked three bricks into the chimney and replaced the holes with removable angle bricks. I hate to know how stuck those bricks are that got knocked into the chimney are! The passive dampers really helped with forcing cool air into the chimney which kept the heat in the ware chamber for a longer period of time. It cut down on my fuel usage too, which amazed me. It wasn't until it was above 1300 degrees Fahrenheit that the kiln really started eating wood, and even then it was not as much as I thought it would have been.
Add caption
 The above photo is of some of the draw trials I pulled from the kiln between the periods of salting. I am very excited to see the gray clay body and the blue cobalt slip colors look good! I am a little concerned about the amount of ash that accumulated from last week's firing with the additional ash from this firing. The below photo is of one of the last draw trials I pulled out from a particularly hot part of the kiln, but when I went to pull it out, it was slightly stuck and then trailed this long spew of salty ash behind it! It looked like a very thin sliver of taffy! When the kiln was crash cooling (I'm sorry I didn't have the mind to take photos) it was evident there is going to be a lot of runny ash glazed pots, which could be either really wonderful or really disastrous.

Tuesday, September 11, 2012

First Kiln Attempt


Sorry not to keep you updated. Late last week I finished the chimney on the kiln. As I shared on Facebook, my other half commented that I looked like a bum in my grubby clothes, but it felt great to put that last brick on.
On Sunday I made some final adjustments and loaded the salty beast up to the brim with new pots. What a sight! My very own kiln filled with my very own work! I will be doing single firing, so all of the pots in the kiln are raw. It took longer to figure out the shelving arrangement than the worry of wanting to go slowly to avoid breaking any pots!
And then on Monday I fired it up early and it ran smoothly, beautifully, climbing in temperature, hitting my goal marks on each hour. That is, until it reached about 1800 degrees.
Accepting defeat is a good thing, and embracing what may seem like a failure is also good in order to learn lessons and make changes. Or, at least that is what I started telling myself last night when we sat at the same temperature for over two hours, trying to get it at least up to Cone 8, but to no avail. I shut it down. Lesson one: if you think your wood is dry enough, it's probably not. The larger wood I started using in the higher temperatures had too much moisture which started slogging down the climbing pace and eventually choking everything up. The coal build up after such a long firing was immense and hard to handle at the end. Lesson two: if you think you have enough wood, double or triple that amount because you may run out. I used a lot of my smaller wood at the beginning, which became harder at the later point to balance out between the larger pieces and the smaller pieces. Lesson three: flue opening and draft. The flue became a problem because it was too large and had too much of a draw, which was good at the beginning, but not at the end. I'm going to try and make a few adjustments without having to take the whole stack down. Today I started getting fresh wood and hope to treat the kiln like it has been bisque-fired and run another firing on Sunday. Here's to hoping for no cracked pots or pots blowing up and a little smoother firing at the end!

Monday, September 3, 2012

Video - Dropping the Arch!

Here is a video of the arch being dropped on the kiln today! The hydraulic sound from the bottle jack adds to the drama and excitement! This link will take you to the video on YouTube in case this embedded video does not work. I will be sure to post some more photos soon of pots and kiln building - on to finish the chimney and hope to fire soon!
Contented with the kiln arch

Thursday, August 9, 2012

Kiln Building Progress

Walls on the kiln about 1/2 way up!
Things are starting to look a little more kiln-like out at Emmaus Farm! I have been balancing making pots with building the kiln in order to (hopefully) fire the kiln shortly after finishing the construction.Getting in from the heat in the afternoon has been helpful, but trying to drag myself back out in the evening to work has been a struggle!
Chimney getting tied in to the back of the kiln
The base for the chimney ate up some time. This whole thing is like a big game of Tetris, trying to figure out where to place a brick without having to cut too much, and how to level everything out. Once that was out of the way things have been rolling a little more smoothly.
Base for the chimney
I have been grateful to my other half and my family who have been helping me clean brick, finish the roof over the kiln, cut brick, and generally keep me partially sane. I would estimate that between moving brick and throwing clay I have been handling between 700 and 1,000 pounds of materials each day. I am officially exhausted! In other news, we had a big storm the other day here in Liberty that resulted in a gorgeous full double rainbow just across the street from our house! These photos don't do justice to how beautiful it was, and don't show the second rainbow quite as well.


Wednesday, August 1, 2012

Messy Details

Dusty shoes after cleaning brick
 Happy August! Building a kiln involves much more work than just throwing some bricks up (which I knew was never going to be the case)! Since my museum adventure hiatus was officially over the other week, I have been working hard to get the remaining brick cleaned (hence the dusty shoes), and get a roof over the kiln.It's always the small, messy details that make things seem to take much longer! Hopefully there will be walls and most of the chimney next week with a potential firing this month! Nothing like picking a hot month for a first kiln firing! Stay cool!
Nailing away on the purlins

Tuesday, May 29, 2012

Kiln Site Visit and Cleaning Brick

Cleaning brick
My world has been a whole lot of cleaning brick lately to get some more of the kiln completed. We've also been working to finish the kiln/machine shed completely before the summer sets in. Lord knows no one wants to work on building a structure in July or August with the heat we have been having lately! I can't imagine what it's going to be like this summer!
Blossom on a zucchini plant!
I have also been working on the 150+ tomato plants we have planted at the farm, suckering and getting them tidied up. We have blooms on our squash and zucchini plants as well as small squash and zucchini! Looks like we may have two varieties of zucchini and some yellow squash at the Greensboro Curb Farmer's Market this weekend!
The trip to Williamsburg/Yorktown, Virginia went well last week. Too brief as usual. Here are some teasers from my visit to Yorktown last week to see the collection of materials from the William Rogers kiln site, from around the second quarter of the 18th-century. See if you can make some guesses as to what is going on in the photos, and then I'll try to get a more detailed post up about some of my finds soon!
Courtesy, National Park Service, Colonial National Historical Park, Yorktown Collection

Courtesy, National Park Service, Colonial National Historical Park, Yorktown Collection

Courtesy, National Park Service, Colonial National Historical Park, Yorktown Collection

Tuesday, May 22, 2012

Catching Up, Show, and Scapes!

"Here's looking at you!"
Last week seemed like the week of playing "catch up" after being away, and getting ready for a show while playing catch up is a bear! I have not forgotten you, dear readers!
Base complete

Floor brick on
The kiln is coming along. Running around like a crazy person (the usual) has kept me from just knocking it out, but I am proud of the progression. Following these photos, the base for the chimney was poured and the block set over the weekend, so I will be tying in the chimney this coming weekend! 
Walls going up!

Door opening at front of kiln
Garlic scape!
Another exciting development on the farm is that we have had scapes on our hardneck garlic! We took some to the Greensboro Curb Farmer's Market last Saturday and should have more there this coming weekend! Scapes are the seed head of the garlic, which comes out in a loopy vine-like piece on the top of the garlic plant. It is a very subtle garlic flavor, and makes an exquisite pesto. I HIGHLY recommend getting your hands on some while they're around!
Pottery Fair on the Square
 The Pottery Fair on the Square at Old Salem went really well this past weekend. Thank you to those who made it out, and new friends and customers who stopped by! Great weather, and the big water cooler found a home. I'm intending to make a few more for the new kiln to try out some designs and styles.
Water Cooler
I am off to Yorktown, Virginia today to see the William Rogers kiln site once more in wrapping up my research and in preparation for a lecture I am doing in June. If you have any interest in Virginia earthenware, there's still time to register for the 2012 Virginia Decorative Arts Seminar entitled, "Earthenware of the Old Dominion"!

Wednesday, May 16, 2012

Weekend Away and More KILN BUILDING!


I spent this last weekend away at Valle Crucis in the mountains at a wedding. Part of the weekend was spent in the rocking chairs as photographed above, and part of the weekend (outside of the FANTASTIC wedding!) was spent looking at beautiful scenery such as this:
Valley behind the Mast General Store

Reception table at the wedding overlooking the mountains

Waterfall above the Valle Crucis Conference Center
I played catch up and got some rest on Monday, then it was back to work! Today Joseph came and helped some more with the kiln building. A lot of progress was made today! The base is done and the walls are going up! This is a going to be a big beast of a kiln!
I am very excited. My reflection on building a kiln though is connected to my weekend away at a wedding. Building a kiln is like getting married. It can be expensive, possibly nerve wracking, you may not know whether it will work out forever, you may not always get along, but by golly, it's a fixture of your life now!
Here are some photos of today's work:
Base of kiln finished

Floor brick going in, dry stacked

Joseph laying the brick in as the walls go up!

Door opening of the future kiln!



Tuesday, May 8, 2012

Kiln Opening and Kiln BUILDING!

My setup at Joseph's
 It has certainly been an exciting last couple of days!It has been filled with preparation for the kiln opening and kiln building!
The kiln opening at Joseph Sand Pottery this past weekend went really well. Thank you all to those who came out for a visit! Don't forget that this coming weekend the kiln opening will be taking place on Saturday, May 12 from 9-5:00 and Sunday, May 13 from 12-5:00. I will not be there, unfortunately, but fortunately it is for a very happy reason- my brother is getting married! I may show up Sunday afternoon, but we will have to see. If you cannot make it to the opening at all, I have put a few pieces from the kiln firing on my Etsy site!
A stack of flowerpots caved over in the back of the kiln

Two shelves broke at the top of the stacks in the kiln resulting in some sculptures like this


Joseph showcased a few of the kiln accidents at the opening. They are fascinating to look at, but utterly frightening when you're the potter! 
Raking and leveling the sand for the kiln base
Joseph and I started building my kiln on Monday! There were a few hiccups to getting things going and it took a little longer to get everything prepped, but by golly, we had a base and the first course by the end of the afternoon! The kiln will be a modified Olsen Fastfire kiln. Modified in the sense that the firing boxes are enlarged for salt firing and using hard brick throughout the kiln.
Joseph measuring the base block/brick
 
My Facebook post from yesterday read:

Observations on first day of kiln building:
1. When you go to pick up the sand and have a man with you, just smile and laugh casually when the guy who loads the sand says to the man with you something along the lines of, "now you be sure to help her with that, hahaha" (I resisted glaring)
2. If you got an estimated number of brick for one part of the kiln, add at least another 50-100 to that number.
3. Sand and clay mixed together resembles a Wendy's frosty.
4. When you think you've moved enough 40 pound block/brick, there's still another 20 or so to be moved...
5. Kilns are expensive. It's not just the materials that go into it, but the blades and other machinery required to build it that adds up!

First course of brick down